2023/12/20

Pharmaceutical factory clean workshop

Pharmaceutical factory clean workshop Release date: 2021-12-08 09:04 Pharmaceutical factory clean workshop In the production process, the pharmaceutical factory requires high air cleanliness and needs to produce in a clean workshop. The company has undertaken the clean room project of the pharmaceutical factory. The cleanliness requirement is level 100000, and the number of air changes reaches 20 times/hour, which meets the production requirements of customers.

Pharmaceutical Industry


2023/12/20

Cooling water system for photovoltaic industry

The process of producing battery chips is more complicated, generally through the main steps of silicon wafer detection, surface texturing, diffusion junction, dephosphorization silicon glass, plasma etching, anti-reflective coating, screen printing, rapid sintering and detection sub-assembly. The general process and equipment for the production of crystalline silicon solar cells and the air conditioning and cooling water systems have certain requirements.

Photovoltaic industry


2023/12/13

TCL Kone Electronics (Huizhou) Co., Ltd.-Water Storage

This project provides 4 900RT centrifuges and 1 3600m "pool for water cooling.

Application Case


2023/08/02

TCL Kone Electronics (Huizhou) Co., Ltd.-Water Storage

This project provides 4 900RT centrifuges and 1 3600m "pool for water cooling.

Application Case


2023/08/02

Aohua New Materials Technology (Shaoguan) Co., Ltd.-Water Storage

Project overview: the use of water storage technology, the low price at night will be cold storage

Application Case


< 1234 >